Improving safety measures for temporary work areas at Robert-Picqué Hospital

At a glance

Villenave-d’Ornon (33)
FAB – Bordeaux Métropole Urban Planning
Improving safety measures for temporary work areas at Robert-Picqué Hospital
2024 – in progress
Hospital campus

Defining the technical, economic, and programmatic conditions for the temporary use of a former hospital site.

Plateau Urbain is assisting the FAB in defining the terms for the transitional use of the buildings of the former Robert-Picqué Military Hospital. The project aims to establish a secure operational framework for the temporary use by analyzing the technical, regulatory, and economic conditions necessary to accommodate new uses on the site.

The work focuses in particular on defining a comprehensive management strategy: identifying usable buildings, planning compatible uses, estimating necessary investments, and conducting economic modeling of future uses.

The transitional phase serves as a true experimental laboratory to support the transformation of a single-use site into a mixed-use economic district, open to its surrounding area and residents, while highlighting the site’s built heritage and landscaped spaces.

Explore other studies

Do you need more information?

Abonnez-vous à la newsletter
de Plateau Urbain